July 2nd, 2024
How To Make the Most Out of ECO4 Funding
Written by: Site Editor
ECO4
"*" indicates required fields
Client: Warrington Housing Association
Main Contractor: Connolly’s
Duration: 12 Weeks
Project: Head Office Refurbishment
Location: Salford
Contract Value: £70,000 circa
Services:
Warrington Housing Association head office formally called ‘The Gateway’ was looking tired, dull and in need of a complete office refurbishment.
GSL successfully won the full Mechanical & Electrical package offering full service from design to installation. We had a lighting design fully commissioned and installed by ourselves.
During the removal of the existing ceiling, air conditioning units were found hidden in the roof space. The original design was modified to accommodate this, the wet central heating system was removed from the original design and the air conditioning units that were in-situ were utilised.
‘The Gateway’ was still occupied during the full refurbishment, we had to make special arrangements for power and utilities to be transferred outside normal office working hours and special care was taken to ensure existing services and utilities were not disrupted.
The offices were completed to high standard, offering Warrington Housing staff members a modern bright working space to continue looking after their residents.
Niki Stockton “Director of Operations”
“GSL Contracting were appointed as sub-contractors to carry out the electrical installation as part of our office refurbishment. They drew up the wiring diagram, in consultation with the main contractor and client & provided the cable trays for our IT contractor to run the data cables. They were very professional, solution focused and delivered an excellent standard of work.”
"*" indicates required fields
We’ve already helped thousands of homes, businesses, and local authorities install energy-saving solutions that have been life-changing both in terms of helping the environment and drastically lowering their energy costs.
Funding Applicants Helped By Our Team
Expert Advisors Ready to Help You
Million Pounds of Annual ECO4 Funding
July 2nd, 2024
Written by: Site Editor
ECO4
June 11th, 2024
Written by: Mk Hk
News
June 11th, 2024
Written by: Mk Hk
News
June 11th, 2024
Written by: Mk Hk
News
June 11th, 2024
Written by: Mk Hk
News
June 1st, 2024
Written by: Mk Hk
News
May 22nd, 2024
Written by: Mk Hk
News
April 25th, 2024
Written by: Mk Hk
News
April 24th, 2024
Written by: Mk Hk
News
April 23rd, 2024
Written by: Mk Hk
News
April 23rd, 2024
Written by: Mk Hk
News
April 23rd, 2024
Written by: Mk Hk
News
April 23rd, 2024
Written by: Mk Hk
News
April 18th, 2024
Written by: Mk Hk
News
March 13th, 2024
Written by: Mk Hk
News
February 27th, 2024
Written by: Mk Hk
News
November 24th, 2023
Written by: admin
News
November 23rd, 2023
Written by: admin
News
November 22nd, 2023
Written by: admin
News
November 22nd, 2023
Written by: admin
News
November 22nd, 2023
Written by: admin
News
November 22nd, 2023
Written by: admin
News
November 20th, 2023
Written by: admin
News
November 20th, 2023
Written by: admin
News
November 20th, 2023
Written by: admin
News
October 3rd, 2023
Written by: admin
News
September 19th, 2023
Written by: admin
News
September 19th, 2023
Written by: admin
News
September 19th, 2023
Written by: admin
News
September 19th, 2023
Written by: admin
News